1-512-931-4486
info@projectisaac.org

Blog

2019 Project – Sekondi School For The Deaf – Wish List / Items Needed

Sekondi School For The Deaf - Wish List / Items Needed

ESTIMATED COST FOR ENTIRE PROJECT = $10,000


INFRASTRUCTURE

  1. Girls’ Dormitory Block
  2. Administration Block
  3. Assessment Center
  4. Infirmary
  5. Assembly Hall
  6. Sand, Stones/Chipping, Gravels, Cement
  7. Vocational Block
  8. Uncompleted Dining Hall Needs Completion
  9. Construction of School Gate


TEACHING AND LEARNING MATERIALS

  1. White Board Markers
  2. Cardboards
  3. A4 Sheets, Pens, Pencils, Rulers, Erasers
  4. Computers
  5. Printers
  6. Toners
  7. Scanner

VEHICLES

  1. Repair Of School Bus
  2. GV. 6 - 16


FOOD STUFF

  1. Maize, Beans, Gari, Flour, Rice
  2. Tin Fish, Tin Tomatoes, Palm Oil, Dry/Fresh Fish
  3. Vegetable Cooking Oil

PROVISIONS

  1. Milo
  2. Milk
  3. Chocolate
  4. Biscuits
  5. Drinks
  6. Sugar

RENOVATIONS

  1. Painting - The Girls/Boys Dormitories
  2. Repair Of Ceiling Fans
  3. Street Bulbs/Bulbs To Replace Dead Ones
  4. Major Crack Repairs On Boys’ Dormitory
  5. Electrical Wires
  6. Sockets
  7. Students’ Beds And Mattresses

KITCHEN (PHASE I)

  1. 2 Gas Cylinders (Capacity: 800 Litres Each)
  2. Secure Block Work Enclosure for Student’s Safety
  3. 3 Commercial Cooking Stoves
  4. 10 Pieces of Big Plastic Basins
  5. Lots of Stainless Steel Bowls
  6. Lots of Ladles
  7. Trolley To Convey Food From Store To Kitchen

GENERATOR

  1. Fuel
  2. Batteries

SANITATION

  1. Detergents
  2. Liquid Soap
  3. Mops and Mop Buckets
  4. Brushes
  5. Cutlass
  6. Rakes
  7. Dust Bins

AUDIO CENTER

  1. Ear Washing Machine
  2. Audiometer
  3. Video Type - Otoscope

Post a comment